How We Do It

Preparation is the Job Nobody Sees

A good floor is decided before a single plank goes down. Here’s what actually happens between measuring up and calling a job finished.

Before We Start

Protecting Your Home First

Before any work begins, we protect what’s already there. Walkways get dust sheets, furniture that’s staying in the room is covered, and access routes are kept clear so the rest of your home isn’t affected by the job happening in one room.

We also confirm the plan with you on the day, which rooms, what order, and roughly how long each stage will take, so there are no surprises once work starts.

Prepping floor for LVT with Spencer and George

Preparation

Getting the Subfloor Right

Most flooring problems, gaps, creaks, lifting edges, trace back to the same cause, a subfloor that wasn’t properly prepared. It’s the part of the job that’s invisible once the floor is down, which is exactly why it’s the part worth doing properly.

Before any material is fitted, we check the subfloor is level, dry and structurally sound. Uneven areas are smoothed, moisture is checked where it matters, and old adhesive or debris is cleared so the new floor has a clean, stable base to sit on. Skip this step and even the best flooring in the world won’t perform the way it should.

Installation

Fitted With an Eye for Detail

Once the subfloor’s ready, installation is where the pattern, direction and layout come together, herringbone, chevron, or a straightforward plank run, each laid out to suit the room rather than just filled in edge to edge.

Expansion gaps are set correctly so the floor can move without buckling, transitions between rooms are fitted flush rather than left as an afterthought, and skirting boards go back on clean and tight to the new floor. It’s the difference between a floor that looks right on day one and a floor that still looks right in ten years.

Commercial Flooring
Herringbone LVT fitted in a large living room space

Looking After Your New Floor

Aftercare, So It Stays Looking Right

Every floor has a short settling-in period, and looking after it properly in the first few weeks makes a real difference long term. We’ll talk you through the specifics for your material on the day, but the basics apply across the board: keep it dry, use protective pads under furniture, and avoid dragging heavy items across the surface.

We’re also on hand afterwards if anything doesn’t look or feel right, a follow-up is always better than letting it go.

WHAT TO EXPECT, START TO FINISH

A Typical Job, Step by Step

  1. 01 Measure and Quote We measure the space and talk through material options, with a clear, no-obligation quote.
  2. 02 Choose and Order Once you've picked your floor, we order materials and agree a fitting date that works for you.
  3. 03 Preparation and Fit Subfloor prepped, old flooring removed if needed, then your new floor is installed.
  4. 04 Finish and Walkthrough Furniture back in place, site cleaned, and a final check together before we call it done.

Ready When You Are

Get a Free, No-Obligation Quote

Getting a quote costs nothing and doesn’t commit you to anything. Get in touch and we’ll come to you.